Slightly less shambolic shack…

Station and lab rebuild is happening slowly.  Testgear rack and tool drawers done, component drawers done, surface-mount area sorted, just the ten boxes of radios, transverters, switching, PSUs, cables, PAs, watercooling systems, plus a dozed rack cases to fit and all those cables to tidy up and label….

At least I got the E4406A into the rack now.